2020 SURREY RECYCLING AND WASTE DROP-OFF FACILITY
Value
$3.5 million
Engineer
Morrison Hershfield

Client/Owner

Clark Builders / Metro Vancouver

Project Description

Site Clearing, Bulk Excavation, Site Preparation, Storm Sanitary, Fully Bagged Watermain with Cathodic Protection and Denso Wrapping, Detailed Structural Excavation, Geotechnical Void Fill, Mechanical and Electrical Detailed Excavation Asphalt Prep 6m Deep Oil Grit Separator, Water Meter and Back Flow Chamber. Offsite BC Hydro. Works in Tight Spaces Inside the Proposed Tipping Floor Trailer Storage.

Project Challenges

This project started right at the onset of COVID so that put a whole new emphasis on construction safety.  


This structure was developed to have the tipping floor slab 2 stories in the air. The construction team had to form up the two-story walls and then we had to crane equipment into the center of the building, then conveyor the material in, grade it and compact it in lifts. 


WE were able to have Surrey and Metro Vancouver agree to approve a recycle structural fill to help metro Vancouver with its sustainable construction plans. Tracking fuel consumption and ensuring newer tiered engines were used to reduce carbon emissions. Alternate measures application was required to worksafe for storm main tie ins to city of surrey infrastructure to ensure crew safety in the event of an emergency.

Responsibilites

• Sub and Supplier Negotiations and Awards Project Superintendent.

• Project Manager.

• Project Coordinator.

• Alternate Measure Plan Development and Administration.

• Quality Plan Management and Administration.

• Safety Program Administration.

• Sub and Supplier Scheduling and Management.