2012 Serpentine Compensation Channel
Value
$400k
Engineer

Client/Owner

City of Surrey

Project Description

Excavate and shape 800m long 4 to 5m deep compensation channel in a swap. Onsite stockpiling and shaping of relocated excavated materials. Line banks with logs and boulders, plant aquatic and semi aquatic species of plants, and Hydro seed the disturbed area surrounding the channel

Project Challenges

It was a very swampy area even in the middle of summer. Access was across railroad tracks and caution had to be taken, along with a rail spotter to ensure safety whenever deliveries or equipment needed to come across. Based on the soft ground, low ground pressure track dumper and swamp matts were used to keep equipment above ground. Sourcing the right amount of logs and boulders was important. The logs needed to be cabled to the boulders to keep them in place making a comfortable spot for fish and other aquatic species to rest in the shade out of predators reach.  

Responsibilites

• Superintendent. 

• Equipment Operator. 

• Staff Training. 

• Labourer. 

• Foreman. 

• Project Manager.


Share by: