2015 COTTONWOOD 563 - 609 Cottonwood Ave. & 612 - 614 Vanessa Court, Coquitlam, BC
Value
$1.2 million
Engineer
Geopacific Consultants Ltd, Rositch Hemphill Architects

Client/Owner

Polygon (Cottonwood) Ltd

Project Description

Bulk Excavation, sloping, disposal of soils and dewatering for 4 story apartment building. Detailed excavation for foundation, crane pad, mechanical. Slab prep. Working

Project Challenges

Another project that took place through the fall that required a lot of dewatering and water treatment. The excavation was adjacent to the Kinder Morgan pipe line and required regular inspection and monitoring to ensure everything was as required. Large boulder splitting was required during this project. The client wanted their sales center built first, as a result the excavation had to be dug from high to low, causing challenges with dewatering. Worked closely with first nations to allow the excavated materials to be repurposed into structure fill for a future development near by. Ensuring Kinder Morgans asset was safe and secure is something we have done a lot and take pride in ensuring compliance with their needs and requirements are met.

Responsibilites

• Working Closely with the Owners and Kinder Morgan. 

• Ensuring that the Project was Completed Safely and Productively. 

• Managing Trucking and Communicating with the Fill Site to Ensure that Trucking was Effective and Productive. 

• Monitoring Safety. 

• Grading  

• Liaising with Coquitlam ESC Monitor to Ensure Compliance with Strict Environmental Requirements. 

• Managing Crew, Subs and Suppliers. 

• Truck Tracking. 

• Review of and Signing Off On All Project Costs.


Share by: